TECHFIT UK RAMS (Risk Assessment Method Statement)

RISK ASSESSMENT FOR INSTALLATION OF WINDOW FILM WORKS AT: -
Customer Name: *
Site : *
Date Prepared:
Risk Assessor:
PERSONS AT RISK :
RIsk Ratings Likelihood Ratings for harm or injury occurring could be:
Rating 0 = Zero to very low Rating
Rating 1 = Very unlikely Rating
Rating 2 = Unlikely Rating
Rating 3 = Likely Rating
Rating 4 = Very Likely Rating
Rating 5 = Almost certain Rating

Severity Ratings for degree of potential harm or injury could be:
0 = No injury or illness
1 = First aid injury or illness
2 = Minor injury or illness
3 = “Three day” injury or illness
4 = Major injury or illness
5 = Fatality, disabling injury, etc

Risk Levels
1 to 8 = Low Risk
9 to 15 = Medium Risk
16 to 25 = High Risk
Risk Assessor:
Signature: *
HAZARDS/ PROCESSES -
1. Persons tripping, falling and slipping -
LEVEL OF RISK -
L
S
R
CONTROL MEASURES TO BE INTRODUCED TO REDUCE RISK -
Notes 1
LEVEL OF RISK -
L
S
R
2. Manual handling injuries -
LEVEL OF RISK -
L
S
R
Notes 2
L
S
R
LEVEL OF RISK -
3. Electric shock from equipment and mains system -
LEVEL OF RISK -
Notes 3
LEVEL OF RISK
4. Abrasions, cuts, from the handling of components, tools & general environment -
LEVEL OF RISK
Notes 4
LEVEL OF RISK
5. Exposure to substances, skin, eyes and inhalation -
LEVEL OF RISK
Notes 5
LEVEL OF RISK
6. Falls from height -
LEVEL OF RISK
Notes 6
LEVEL OF RISK
7. Collisions and contact with vehicles, mobile and permanent plant and equipment at the ground level external areas -
LEVEL OF RISK -
Notes 7
LEVEL OF RISK
8. Noise and Vibration
LEVEL OF RISK
Notes 8
LEVEL OF RISK
RISK ASSESSMENT FOR INSTALLATION OF WINDOW FILM WORKS AT: - -
Customer Name: *
Site :
On behalf of techfit UK this Method Statement has been created by: -
Risk Assessor:
______________________________________________ -
Signature: *
Mobile No.
METHOD STATEMENT Safe Working Method Statement for the Installation of Window Film at:
@
Date Prepared:
Period of Project:
Name of Manager responsible for Method Statement:
Techfit UK
17 Thursby House
Gateshead
NE9 6NL
Telephone : 0191 4206351


THIS METHOD STATEMENT SHOULD BE USED IN CONJUNCTION WITH THE TECHFITUK HEALTH AND SAFETY POLICY AND THE RELEVANT RISK ASSESSMENT.
1. Main Hazards from the Work The hazards identified for this work include:
Manual handling
Items falling from height
Falls from height
General abrasions, cuts, from the works and tool use, etc
General slips, trips and falls
Injuries to occupants and members of the public
2. Tradespersons and Foreword All tradespersons involved in the contracts works will be competent and will hold all necessary and legally required qualifications as a minimum.
All tradespersons involved or employed by TECHFITUK will Work to this method statement and risk assessments and to the requirements of the site rules of the client and any other rules that may be set.
Any person involved in the works will know of these requirements and encouraged to play an active part in the safety of the workplace in particularly by reporting defects and problems that they may become aware of.
All work persons will wear personal protective equipment, (PPE) to include as a minimum foot protection, general overalls/body wear (including high visibility vest/jacket). If required at any time other items of PPE will be made available, depending on the area of works and local requirements and worn such as hard hats, eye protection, hearing protection, hand protection, respiratory protection, etc.
3. The General Works Access to the working areas and times will be agreed with the clients and occupiers prior to work commencing and if required at a period when the work areas are not in use, or low use to carry out the works area. The work i.e. the fitting of the window film and the removal of any existing film will commence once agreement is finalised.

Removal/fitting of Window Film Works

We will arrive on site, measure the windows, prepare & clean the windows. We will be bring a cutting machine, which in simple terms, is a 1.6m cello tape dispenser, that we mount onto some 5-6 tread ladders (similar to the below photo. Our Installer(s) are equipped with Window Film, Cutting Machine, a Tool Belt around their waist and a water. Our Window Film is wet applied using a fine water spray. Therefore we ask that you move anything from the surround area that you do not want to get ‘wet’. Every care is taken not for wet anything unnecessarily. Work for the removal of any existing window film will be peeled or scraped off the existing glazing. Once removed the glass will then be cleaned using a soapy solution of washing up liquid. The operative will wear gloves for any excess. The new film to be applied will be will not be treated with any substances, the paper covering to the rear of the film, cut to size, will be removed which will activate the adhesive side of the film. The film adhesive side will then be applied to the glazing and excess edges trimmed with a hand knife.
4. Control of Substances Substances Substances hazardous to health to be used during this operation will be minimal with just some diluted washing up liquid to form a mild cleaning solution for the glazing.
PPE in the form of gloves will be used as the main control to prevent skin contact for excess amounts. A COSHH assessment has been formulated for this low risk product.
Should it arise during the contract of works that any other substance will be required or be applicable the relevant health COSHH assessments will be formulated.
5. Manual Handling Manual handling risks for this contract of works are not avoidable, as the some of the materials will have to be manually handled but these are in manageable low weights, forms and sizes that can acceptably be manually handled such as the rolls of film, general waste film materials. Two persons will be used when available to avoid any person from manually handling excessive weights and to reduce the potential risk. Trades persons will be aware and instructed as to the correct handling techniques and the actions to take to minimise injury. The use of basic mechanical aids, such as a sack barrow, may also be used for excesses of materials. The use of multi person lifts will be the main other option. No tradesman will be allowed to lift any excessive weight. We do not handle or move glass.
6. Fire Safety / Emergency Procedures TECHFITUK employees will abide by the client premises Fire Procedures. The general works will be controlled to remove any major fire risks with the general measures will be ensured with no hot work processes taking place and removal of excess flammable items/debris.
7. Personal Protective Equipment (P.P.E) Relevant P.P.E will be provided for employees as mentioned to meet the relevant B.S./E.N. Standard.
8. Welfare and Sanitary Conveniences The welfare facilities of the building/site will be utilised or nearby facilities if this is inconvenient.

All tradespersons will be briefed to use the facilities and to look after them.
9. Plant, Equipment and Tools Plant and equipment generally used will be minimal as described and will mainly be such as access equipment, ladders, stepladders, etc and other general light hand tools. TECHFITUK employees will abide by the client premises Fire Procedures. The general works will be controlled to remove any major fire risks with the general measures will be ensured with no hot work processes taking place and removal of excess flammable items/debris.

When preparing and cutting Window Film, we use a Film Handler aka Cutting Machine. This is a 60inch wide tape dispenser mounted onto the top of a set of 6 or 8 tread step ladders. We would prefer a set up area at least 2m x 2m floor space, clear to enable us to work safely around this machine. All bladed on the machine are guarded by metal fixings.

Any equipment used will be maintained and inspected.

If any other equipment may be needed this will be raised with the client. If such equipment may require to have appropriate Certificates/Records of Test, etc then these will be provided such as for electrical items. Should any such equipment be required which requires additional specific training, then this will be provided or ensured.
10. Access and Egress etc All walkway areas of access and egress will be maintained free of hazards and debris during and after the works at every shift.
11. Control of Noise and Vibration Noise levels for the general works will be very low and should not require major action as required under the Control of Noise at Work Regulations 2005. Suitable hearing protection will be provided and available in any case.

No items of vibrating equipment are to be used.

Specific noise assessments or detailed vibration assessments will not be necessary for this work.
12. General Controls Should other control methods may be required identified during the works, then this will be raised with the client.
13. Electrical Power Tools Electrical power tools and equipment will not be required.

All other equipment and will be inspected, maintained and recorded.

In the event of power tools being needed all tools will be PAT tested.
14. First Aid/Accidents The First Aid provision will be that of TECHFITUK. All trades persons know of this arrangement and the need to register all accidents. A first aid box will be kept
within the company vehicle.
15. Site Management / Authorised Persons TECHFITUK will work under the authorisation of the client and will control the immediate area of works. TECHFITUK will supervise, manage and control their work activities and them selves will generally manage and monitor matters during the contract of works in pursuance of the implementation
of this method statement.
On behalf of TECHFITUK this Method Statement has been created by: -
Signature: *
Date:
Name: *
On behalf of TECHFITUK this Method Statement has been issued to (Site Supervisor): -
Signature: *
Date: